Mining Bitcoin since 2012

Power in.
Compute out.

HM Tech is one of the longest-running Bitcoin mining companies in the United States. Founded in 2012, we have done things the right way from day one, and we bring that experience to every client we take on. Let us help you build the right solution.

HM Tech emblem: the master kicking through a Bitcoin network
2012
Founded in a garage by one of Bitcoin's OGs
100K+
Miners deployed to date
10K+
ASICs repaired to date
1.4GW
Of mining sites designed and consulted on
Capabilities

One team from first load study to last firmware update.

We design only what we would be willing to operate, because we operate it.

Consulting & feasibility

Site selection, power economics, and investment-grade models before capital is committed.

Energy costHashprice modelsDue diligence

Design & engineering

Electrical, cooling, and network design for high-density compute, documented to basis-of-design standard.

480V 3‑phaseSwitchgearDirect-to-chip cooling

Procurement & logistics

Hardware sourcing, containerized infrastructure, and international freight, with price protection written into every contract.

ASICs & GPUsHydro containersTransformers

Buildout & commissioning

Field crews that set containers, land power, fill coolant loops, and bring hashrate online on schedule.

Electrical tie-inCoolant chemistryBurn-in

Operations & monitoring

Around-the-clock fleet monitoring, remote network support, and on-site agents that keep uptime high.

24/7 NOCDaily reportingField response

Energy strategy

We treat power as the product, and we lower the delivered cost per kWh through market participation, curtailment, and on-site generation.

ERCOT real-time4CP avoidanceGas-to-power
Direct-to-chip liquid cooling

We delivered the first hydro-cooled mining container in the United States.

In July 2023, HM Tech delivered the first hydro-cooled mining container in the U.S. to a site in West Texas. Direct-to-chip hydro cooling has been our specialty ever since.

We have the full discipline: loop and dry-cooler sizing, coolant chemistry and freeze protection, filling, balancing, and commissioning, plus the operating practices that keep a hydro fleet running at full output. The same expertise carries straight into high-density AI and HPC halls.

Jul 2023
First hydro-cooled mining container delivered in the U.S.
DLC
Direct-to-chip hydro cooling specialists
Mining + HPC
One cooling discipline across ASIC and GPU loads
Approach

Every electron, accounted for.

The same discipline applies to a 2 MW container drop and a 40 MW campus. Each phase is engineered for the one that follows it.

₿ Power sourceGas · Grid · Hydro SubstationStep-down Switchgear480V distribution ComputeHydro · Air · DLC OutputBTC · AI · Grid
Phase 1

Assess

Power availability, delivered cost, site conditions, and a financial model that holds up to scrutiny.

Phase 2

Design

A basis of design covering electrical, cooling, network, and security, sized for day one and for expansion.

Phase 3

Build

Procurement, logistics, and field crews, with phased deployment trips and commissioning sign-off.

Phase 4

Operate

Monitoring, reporting, and maintenance, plus continuous tuning of uptime and energy cost for the life of the asset.

14years in Bitcoin mining

Built by an operator, not a reseller.

HM Tech has been in this industry since 2012, and we still own and run our own mining infrastructure in West Texas. Every design we recommend has already been tested against our own power bills, our own uptime, and our own balance sheet.

Our clients are not hiring a vendor. They are choosing a proven operator as their partner. That is why we take on a limited number of clients: we will not make a promise we cannot keep, so we commit only where we can build the right solution, end to end, and see it through.

Selected work

Turnkey, from first drawing to first block.

We deliver complete programs, not pieces of one. One accountable team designs the site, sources every component, deploys it, trains the people who will run it, and supports it afterward. Client identities stay confidential.

What turnkey means at HM Tech
  1. Basis of designElectrical, cooling, structural, and site layout, documented to engineering-firm standard before anything is ordered.
  2. Network architectureSegmented site networks, firewalls, redundant pool gateways, and secure remote access.
  3. Full-scope procurementEvery component, from mining hardware and hydro containers to dry coolers, transformers, switchgear, PDUs, and network gear.
  4. LogisticsFactory-to-site freight, container sets, and delivery scheduled to the build sequence.
  5. On-site deploymentHM Tech engineers on the ground to set containers, land power, fill and balance coolant loops, and commission the fleet.
  6. Operator trainingHands-on training for the client's site team on daily operations, maintenance, and fault response.
  7. Treasury and controlsSelf-custody treasury policy and payout controls, so mined Bitcoin is protected from day one.
  8. 24/7 supportFleet monitoring, automated daily reporting, remote network support, and scheduled return trips.
Current programTurnkey · Hydro-cooled

30 MW turnkey hydro-cooled mining program

A multi-year, multi-phase program for an international industrial client with its own power generation. HM Tech owns the full delivery: the basis of design, the network architecture, procurement of every component including all mining hardware, logistics, on-site deployment, and training of the client's operators. The first phase is live and under HM Tech's 24/7 monitoring, and later phases are timed to the client's power additions.

  • Basis of design and container electrical commissioning, verified within rated spec
  • Site network with firewall segmentation and redundant pool gateways
  • All components sourced and delivered by HM Tech, mining hardware included
  • On-site deployment and operator training by HM Tech engineers
  • Self-custody treasury policy, 24/7 monitoring, and daily reporting
30 MW
Full program scale
1,186
Miners deployed in phase 1
420 PH/s
Hashrate at phase 1 handover
24/7
Monitoring and support
Owner-operatorERCOT · West Texas

HM Tech West Texas mining campus

Our own 30 MW containerized site, with 8 MW energized today. It runs on ERCOT real-time pricing with automated curtailment and 4CP transmission-peak avoidance. Every practice we deliver to clients is proven here first, and the fleet is moving from air-cooled to hydro-cooled for more output per megawatt.

30 MW
Site capacity
8 MW
Energized today
95%
Blended uptime target
EngineeringAI / HPC

40 MW liquid-cooled HPC campus

A basis of design for a high-density AI and GPU campus with direct-to-chip cooling, modular compute halls, and substation integration. The work covered cooling tonnage, chiller versus dry-cooler sizing, and PUE across DLC, hybrid, and air.

40 MW
IT load basis
DLC
Direct-to-chip
BOD
Deliverable
Built 2016–2019North Carolina

11 MW hosting and repair facility

Designed, built, and operated by HM Tech: a 60,000 square-foot facility that combined mining hosting with the largest ASIC repair operation in North America, certified by every major hardware manufacturer.

11 MW
Facility capacity
60,000
Square feet
All OEMs
Repair certified
In developmentTexas

20 MW gas-to-power compute facility

Behind-the-fence natural gas generation powering on-site compute, with three revenue streams: AI hosting, Bitcoin mining, and grid sales during price spikes.

20 MW
On-site generation
3
Revenue streams
BTM
Behind-the-meter
Our history

From a garage to 20 MW across three sites in two states, and back to building.

Fourteen years of building real assets, repairing the industry's hardware, and keeping sites running.

HM Tech LLC logo: Hash with the Master
2012

A garage in North Carolina

Our founder started mining Bitcoin in his own garage, long before the industry existed. That is where he learned the hardware, the power, and the heat firsthand.

2014

HashMaster is formed

The garage operation became a professional company. Keeping our own machines alive led to repairing everyone else's.

2016

Breaking ground in North Carolina

We began construction on a dedicated hosting and repair facility in North Carolina.

2018

HM Tech and HMT Consulting

HashMaster became HM Tech LLC, and HMT Consulting was formed the same year. We began earning repair certifications from every major hardware manufacturer.

2019

11 MW, 60,000 square feet

The North Carolina facility was completed at 11 MW and 60,000 square feet. HM Tech grew into the largest and most trusted ASIC repair facility in North America.

2019–2025

A household name in Bitcoin mining

Over these years we consulted for, and worked alongside, almost every publicly traded Bitcoin miner in the United States, and HM Tech became a household name in the industry. In 2023 we expanded mining into West Texas, and in 2024 we laid groundwork in El Salvador, where we plan to build once the grid can support mining at scale.

Jul 2023

First hydro-cooled container in the U.S.

HM Tech delivered the first hydro-cooled mining container in the United States to a West Texas site. Since then we have specialized in direct-to-chip hydro cooling.

Feb – Jul 2026

The Synteq transaction

In February 2026 we agreed to sell the company to Synteq. The sale was unwound in July of the same year.

Aug 2026

Rebuilding

We began rebuilding by revitalizing our 30 MW West Texas mining site, now 8 MW energized, and refocused HM Tech on self-mining, consulting, and site design. Since then we have taken on a 30 MW turnkey mining program for an international client, with 1,186 miners deployed in its first phase, and delivered a 40 MW HPC basis of design.

Next

25 to 50 MW

We are scaling owned capacity through hydro-cooled expansion, new sites, and energy-to-compute projects that pair low-cost power with mining and AI workloads.

Speaking and media

Why HM Tech

Infrastructure that pays for itself.

Energy-first economics

Power cost decides who wins. We engineer every project around the lowest sustainable delivered cost per kWh.

Field-proven teams

Our engineers set the containers, land the power, and commission the fleet, then stay connected through 24/7 monitoring.

Transparent contracts

Phased programs, price protection, and clear scope, so clients know exactly what they are buying and when it arrives.

Have power?
Let's put it to work.

Evaluating a site, scaling a fleet, or designing an HPC facility? Send us the megawatts, the location, and the timeline.